首页> 外文会议>IITA International Conference on Geoscience and Remote Sensing >Features of wire ice coating in Erlang Mountain
【24h】

Features of wire ice coating in Erlang Mountain

机译:埃尔兰山钢丝涂层的特点

获取原文

摘要

Wire ice coating is very important to electric power design. And the ice coating research in Erlang Mountain is relatively urgent to the electricity transmitting from west to east in China. The ice coating record from 2002 to 2006 by Erlang Mountain wire ice coating observation station of Southwest Electric Power Design Institute (SWEPDI) was used to analyze the diitrutition and change of the ice coationg in this area. Then the impact of meteorological factors on the ice coating was discussed in detail. The results show that the ice coating in winter mainly includes mixed freezing and the rime. The, mixed freezing relatively frequent in most months in winter except In January. But the rime occurred mainly in relatively cool months as December, January and February. The density change range of different ice coating has a little difference. The glaze has higher density than rime and mixed freezing. Then a multiple regression between the ice density and many meteorological elements was proposed. At last the impact of topography on the ice coating was interviewed by comparasion. The standard ice thickness ratio in windward is greater thanin leeward. But sometimes it is opposite in certain conditions
机译:电线涂层对电力设计非常重要。 Erlang山的冰涂层研究相对迫切地对中国西部到东部的电力传播。从2002年到2006年的冰涂记录由西南电力设计研究所(SWEPDI)的Erlang山钢丝冰涂观察站(SWEPDI)用于分析该地区冰涂层的二零和变化。然后详细讨论了气象因子对冰涂的影响。结果表明,冬季冰涂层主要包括混合冻结和霜。除了1月外,在冬季的大多数月内相对频繁地混合。但霜主要发生在于12月,1月和2月的相对凉爽的月份。不同冰涂层的密度变化范围有点差异。釉料的密度高于钻孔并混合冷冻。然后提出了冰密度和许多气象元素之间的多元回归。最后,通过比较采访了地形对冰涂的影响。迎风的标准冰厚度比在Leeward中大于。但有时它在某些条件下是相反的

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号