首页> 外文会议>International Congress on Advances in Nuclear Power Plants >Traversing In-core Probe (TIP) replacement in BWR plant
【24h】

Traversing In-core Probe (TIP) replacement in BWR plant

机译:在BWR植物中遍历核心探头(尖端)更换

获取原文

摘要

Toshiba has supplied the full scope Traversing In-core Probe (TIP) system to the Cofrentes Nuclear Power Station in Spain in 2011. Toshiba has supplied drive control and flux monitoring unit, driving mechanism, indexing mechanism, and other related components to the Cofrentes Nuclear Power Station and the upgraded system is operating since November 2011. TIP system is to measure axial distribution of neutron or gamma flux in the reactor core of the Boiling Water Reactor (BWR). Toshiba has significant TIP operating experience in Japanese BWRs. Many design improvements based on the experience have been implemented to the mechanical components (driving mechanism, indexing mechanism). As well as full scope system upgrade, Toshiba has experience of partial upgrade of TIP system. The partial upgrade capability enables utilities phased upgrade approach which provides flexibility to the utility's maintenance plan. In the paper, TIP system configuration, experience of the TIP replacement and the performance of the TIP after installation are introduced. Toshiba' strategy for the upgrade of other key I&C system such as Reactor Manual Control System (RMCS)/Rod Position Indication System (RPIS) and Rod Control & Information System (RC&IS) will be also briefly introduced.
机译:东芝已经将整个范围提供给核心探头(提示)系统到Cofrentes核电站于2011年。东芝提供了驱动控制和助焊剂监测单元,驱动机构,分度机制和其他相关组件到Cofrentes核发电站和升级系统自2011年11月以来运营。尖端系统是测量沸水反应器(BWR)的反应器核心中中子或伽马通量的轴向分布。东芝在日本BWR中拥有重要的尖端经验。基于经验的许多设计改进已经实现为机械部件(驱动机构,分度机制)。除了全部范围系统升级,东芝具有尖端系统的部分升级经验。部分升级功能使实用程序能够进行分阶段升级方法,这为公用事业的维护计划提供了灵活性。在纸质中,尖端系统配置,介绍了尖端更换的经验和安装后尖端的性能。 TOSHIBA'升级其他关键I&C系统的策略,如电抗器手动控制系统(RMCS)/杆位置指示系统(RPI)和杆控制和信息系统(RC&IS)也将简要介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号