BP wished to confirm the integrity of a mooring chain in the chain stopper location which had been in service a number of years, and required an inspection technique that would give quantitative information. It was agreed that in order to be conservative the detectable flaw size with 90% probability of detection should be 20mm through wall and 100mm long.
展开▼