首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >New Project Management Approach for Offshore Facilities Rehabilitation Projects
【24h】

New Project Management Approach for Offshore Facilities Rehabilitation Projects

机译:近海设施康复项目的新项目管理方法

获取原文

摘要

All the offshore facilities for most oil and gas companies are matures now as most of the offshore platforms were constructed from 1960 with life time over 50 years. Therefore, most of the owner companies start to perform a rehabilitation projects for the structural, mechanical, piping , electrical and all the other facilities to maintain then to have a safe longer life and to comply with the recent standard and technical practice. Therefore, the project strategy for this type of brown field project is totally different than the applied strategy for green field for a new offshore platform. In these type of projects there are many stakeholders to manage that influence the project as the endeavor users are usually have a higher expectation from these projects, In addition to that the new facilities will use a new technique match with the up to date technology. This paper will present the nature of project management for this type of projects and the challenges that faces the team along the project life cycle. The new approach for the whole building commissioning system technique will be discussed as a solution that cover the pitfall for applying the normal project management procedures in the brown field for oil and gas projects.
机译:大多数石油和天然气公司的所有离岸设施现在都是现实,因为大多数海上平台是从1960年建造的,生命时间超过50年。因此,大多数业主公司开始为结构,机械,管道,电气和所有其他设施进行康复项目,以维持安全的更长的寿命,并遵守最近的标准和技术实践。因此,这种棕色田间项目的项目策略与新的海上平台的绿地的应用策略完全不同。在这些项目中,有许多利益相关者可以管理影响项目,因为努力用户通常具有更高的这些项目的期望,除了新的设施将使用新的技术与最新技术相匹配。本文将为这种项目管理项目管理的性质以及面临沿着项目生命周期的团队面临的挑战。整个建筑调试系统技术的新方法将被讨论为涵盖陷阱的解决方案,以应用石油和天然气项目的棕色领域的正常项目管理程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号