首页> 外文会议>International Conference on Soil Mechanics and Geotechnical Engineering >Phased calculation of stresses and displacements due to tunnelling the Botlek Railway Tunnel in the Netherlands
【24h】

Phased calculation of stresses and displacements due to tunnelling the Botlek Railway Tunnel in the Netherlands

机译:由于荷兰的Botlek铁路隧道隧道隧道划分的压力和位移计算

获取原文

摘要

In the Netherlands two pilot projects, The Second Heinenoord Tunnel and the Botlek Railway Tunnel, for tunnelling in soft soil are almost completed. Under authority of the Centre for Underground Construction (COB; Gouda) those projects were extensively monitored. In this abstract, a phased numerical analysis and modelling of stresses and displacements due to tunnelling at the Botlek Railway Tunnel will be discussed, including a finite element model to predict the settlements due to tail void grouting. In six cross sections the settlements on the surface together with deformations along a vertical line were measured in the underground. For cross section MQ4 an extensive set of predictions was made. The results are compared with the measurements which followed up the predictions.
机译:在荷兰两种试点项目,第二次海伦欧德隧道和博特克尔铁路隧道,在软土中隧道隧道几乎完成。根据地下建筑中心(COB; Gouda)的权威,这些项目被广泛监测。在此摘要中,将讨论在Botlek铁路隧道上隧道引起的应力和位移的分阶段数值分析和建模,包括有限元模型,以预测由于尾空隙灌浆引起的沉降。在六个横截面中,在地下测量表面上的表面与垂直线变形的结合。对于横截面MQ4,进行了广泛的预测。将结果与随访预测的测量进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号