首页> 外文会议>International Conference on Soil Mechanics and Geotechnical Engineering >Design and construction of tunnels in Lot A of the highspeed rail link Cologne-Frankfurt
【24h】

Design and construction of tunnels in Lot A of the highspeed rail link Cologne-Frankfurt

机译:隧道隧道设计与施工,高速铁路连接科隆 - 法兰克福

获取原文

摘要

The twin-track tunnels of the high-speed railway line between Cologne and Frankfurt on Main with their large excavation section of up to 160 m~2 and shallow cover posed great challenge for contractors and designers. The paper describes the geotechnical problems and their solutions during the design and construction of the six tunnels in the north section of the alignment. The paper also touches on issues relevant to the design-build practice in the project.
机译:科隆和法兰克福之间的高速铁路线的双轨隧道主要挖掘部分,高达160米〜2,浅封面为承包商和设计师提出了巨大挑战。本文介绍了在对齐北部的六个隧道的设计和构建过程中的岩土问题及其解决方案。本文还触及了项目中设计建立练习的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号