The design and construction of the cross-harbour road and rail links, Belfast

机译:贝尔法斯特跨海公路和铁路连接的设计与施工

获取原文
获取原文并翻译 | 示例
           

摘要

The paper describes the principal features of the design and construction of the elevated road and rail links in central Belfast, Northern Ireland. The project was the subject of a three-stage design and construction competition. This paper outlines the evolution of the winning design and details the most significant elements of that design. The road link comprised elevated dual two to four lane carriageways over a total length of 950 m, with a separate parallel rail link of 1500 m. Both structures included a river crossing of 165 m. The overall geometry involved significantly curved alignments. For the foundations, the design and installation of major cofferdams and steel-tube piles in the river are outlined, together with the installation of 2200 precast concrete and continuous flight auger piles on land. The bridge decks are of concrete box construction, precast in match-cast segments in a purpose-built three-cell factory. The land spans comprised 828 segments 2.2 m deep weighing between 55 t (road) and 75 t (rail), while the river spans comprised 230 segments varying between 2.2 and 5 m deep weighing up to 95 t. The balanced cantilever erection techniques using a 230 t crawler crane on land and a similar crane strapped to the deck of a flat-top barge in the river are described, together with the dimensional controls exercised during fabrication and subsequent erection of the decks.
机译:本文介绍了北爱尔兰贝尔法斯特中部高架道路和铁路连接的设计和施工的主要特征。该项目是三阶段设计和施工竞赛的主题。本文概述了获奖设计的演变过程,并详细介绍了该设计中最重要的元素。道路链接包括总长950 m的高架双2至4车道行车道,以及单独的1500 m平行轨道链接。两种结构均包括165 m的河流过境点。总体几何形状涉及明显的弯曲对准。对于基础,概述了河中主要围堰和钢管桩的设计和安装,以及在陆地上安装2200预制混凝土和连续螺旋钻桩的过程。桥面板为混凝土箱形结构,在专用的三室工厂中以火柴浇筑段预制。陆地跨度包括在55吨(公路)和75吨(铁路)之间的828个2.2 m深的段,重达95吨,而河流跨度包括在2.2到5 m深度之间的230个段。描述了一种平衡悬臂安装技术,该技术使用陆上230吨履带式起重机和绑在河中平顶驳船甲板上的类似起重机,以及在甲板制造和后续安装过程中进行的尺寸控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号