Innovative design and construction technique for the bridge abutments of the temporary construction road along Viaduct 3 of the Gautrain Rapid Rail Link

机译:Gautrain快速铁路3号高架桥沿临时施工道路桥梁桥台的创新设计和施工技术

获取原文
获取原文并翻译 | 示例
       

摘要

Bombela Civils Joint Venture (BCJV) approached Kaytech Engineered Fabrics to offer an alternative design for the abutment walls of a temporary road bridge crossing Allandale Road. The temporary bridge runs parallel to Viaduct 3 of the Gautrain Rapid Rail Link (GRRL) route and will carry construction traffic during the construction of the viaduct. Kaytech approached ARQ Consulting Engineers to prepare a design for the abutment walls consisting of a geosynthetic-reinforced backfill, dry-stacked, concrete block retaining wall system. As far as the authors are aware, this is one of the few applications in South Africa of this type of retaining system used as bridge abutments directly carrying the weight of the bridge deck and applied traffic loadings.
机译:Bombela Civils合资企业(BCJV)与Kaytech Engineered Fabrics接触,为穿越Allandale路的临时公路桥梁的桥台墙提供替代设计。临时桥平行于Gautrain快速铁路(GRRL)路线的3号高架桥,将在高架桥施工期间进行施工。 Kaytech与ARQ咨询工程师联系,为基台墙准备了一个设计,该设计由土工合成材料加筋回填,干砌混凝土砌块挡土墙系统组成。据作者所知,这是南非为数不多的此类固定系统的应用之一,该系统用作直接支撑桥面板重量和所施加交通负荷的桥台。

著录项

  • 来源
    《Civil Engineering》 |2007年第9期|10-12|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号