首页> 外文会议>European conference on safety and reliability >Quantified risk assessment in hydropower plants
【24h】

Quantified risk assessment in hydropower plants

机译:水电站量化风险评估

获取原文

摘要

There are many dangerous situations when work is performed in a power production facility. Every year people working with operation and maintenance are killed or injured. There are also large economical risks making ownership and management uncertain and difficult. common methods for risk assessment are often rather expensive and will not be used in hydropower stations because of its relatively small size and low profit. To overcome this, Vattenfall has adjusted some well-known risk assessment methods and used experiences from several years of hydropower production, making it possible to perform quantitative risk assessment in a less expensive way.
机译:在电力生产设施中执行工作时存在许多危险情况。每年使用运营和维护的人被杀死或受伤。还有很大的经济风险使所有权和管理不确定和困难。风险评估的常见方法通常是相当昂贵的,因此由于其尺寸相对较小,利润低,因此不会用于水电站。为了克服这一点,Vattenfall调整了一些着名的风险评估方法,并从多年的水电生产中使用了经验,使得可以以更便宜的方式进行定量风险评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号