首页> 外文会议>European conference on safety and reliability;ESREL'99 >Quantified risk assessment in hydropower plants
【24h】

Quantified risk assessment in hydropower plants

机译:水电厂的量化风险评估

获取原文

摘要

There are many dangerous situations when work is performed in a power production facility. Every year people working with operation and maintenance are killed or injured. There are also large economical risks making ownership and management uncertain and difficult. common methods for risk assessment are often rather expensive and will not be used in hydropower stations because of its relatively small size and low profit. To overcome this, Vattenfall has adjusted some well-known risk assessment methods and used experiences from several years of hydropower production, making it possible to perform quantitative risk assessment in a less expensive way.
机译:在电力生产设施中进行作业时,存在许多危险情况。每年,从事操作和维护工作的人员都被杀死或受伤。还有很大的经济风险,使所有权和管理变得不确定和困难。常见的风险评估方法通常相当昂贵,并且由于其规模较小且利润较低,因此不会在水力发电站中使用。为了克服这个问题,Vattenfall调整了一些著名的风险评估方法,并借鉴了几年水电生产的经验,从而有可能以较便宜的方式进行定量风险评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号