...
首页> 外文期刊>Energy for sustainable development >Environmental risk assessment of small hydropower (SHP) plants: A case study for Tefen SHP plant on Filyos River
【24h】

Environmental risk assessment of small hydropower (SHP) plants: A case study for Tefen SHP plant on Filyos River

机译:小型水力发电厂的环境风险评估:以菲利奥斯河上的特芬小水电为例

获取原文
获取原文并翻译 | 示例
           

摘要

A multi-criteria scoring tool is used to assess the environmental risk level of small hydropower plants on the basis of documented evidence, measured data, and on-site observations. The assessment is based on evaluating compliance with the standards of the European Bank for Reconstruction and Development (EBRD). The following environmental criteria are assessed: environmental flow, water quality, fish passage and protection, watershed protection, threatened and endangered species. I evaluated the Tefen hydropower plant, which has been in operation on the Filyos River in northwestern Turkey since 2011. The assessment showed that the plant failed all of the EBRD criteria.
机译:在记录的证据,测量数据和现场观察的基础上,使用多标准评分工具评估小型水电站的环境风险水平。该评估基于对欧洲复兴开发银行(EBRD)标准的合规性评估。评估了以下环境标准:环境流量,水质,鱼类通过和保护,流域保护,受威胁和濒危物种。我评估了Tefen水电站,该电站自2011年以来一直在土耳其西北部的Filyos河上运营。该评估表明,该电站未能满足所有EBRD标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号