Risk Mitigation when Microtunneling in Adverse Soil and Rock Conditions: A Case Study

机译:在不利的土壤和岩石条件下进行微隧道时的风险缓解:一个案例研究

获取原文

摘要

In 2010 Stantec was awarded the environmental assessment (EA), detailed design and contract administration for theCity of Kawartha Lakes’ Northwest Trunk Sewer project, which included installation and replacement of 4.5 km ofgravity sewer and 6 km of forcemain. The City of Kawartha Lakes relied on Federal Infrastructure stimulus fundingfor this project which was provided with strict project completion timelines. This led to an accelerated projectschedule.To facilitate efficient construction schedules, the project was split into six (6) independent contracts, the mostcomplex of which included a twin 500 mm diameter concrete pressure pipe (CPP) forcemain installation over a 220m crossing of the Scugog River by microtunneling. Given the scale of the project, the presence of provinciallysignificant wetlands in the region, and potentially contaminated sediments across the Scugog river crossing, it wasimperative to minimize risks and project delays.
机译:2010年,Stantec获得了环境评估(EA),详细设计和合同管理的资格, Kawartha Lakes市的西北干渠工程,其中包括安装和更换4.5公里的 重力下水道和6公里的力管Kawartha Lakes市依靠联邦基础设施刺激资金 为该项目提供了严格的项目完成时间表。这导致了一个加速的项目 日程。 为了促进高效的施工进度,该项目被分成六(6)个独立合同,其中最大的是 其中包括一个直径为500 mm的双混凝土压力管(CPP)的综合体,主要安装在220英尺上 通过微隧道穿越Scugog河。鉴于项目的规模,省级的存在 该地区重要的湿地以及整个Scugog河道中可能受到污染的沉积物, 必须最大程度地降低风险和项目延误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号