机译:使用Fuzzy-AHP基于风险评估的不利地质条件下的岩石TBM选择
Department of Mining and Metallurgical Engineering, Amirkabir University of Technology, Hafez 424, P.O. Box 15875-4413, Tehran, Iran;
rnDepartment of Mining and Metallurgical Engineering, Amirkabir University of Technology, Hafez 424, P.O. Box 15875-4413, Tehran, Iran;
rnDepartment of Mining and Metallurgical Engineering, Amirkabir University of Technology, Hafez 424, P.O. Box 15875-4413, Tehran, Iran;
rnDepartment of Energy and Mineral Engineering, Pennsylvania State University, University Park, PA, USA;
rnMember of Young Researchers Club, Islamic Azad University of Ghaemshahr, Ghaemshahr, Iran;
fuzzy-AHP; TBM selection; adverse geological conditions; geotechnical risk; tbm performance; zagros long tunnel;
机译:基于岩土工程风险评估的困难地面条件下岩石TBM选择方法
机译:硬岩TBM干扰受到不利地质条件的影响:影响因子,危险模式和高岭土山隧道的案例研究
机译:不良地质超前勘察在硬岩TBM隧道施工中的实践-以吉林省中部松花江输水工程为例
机译:基于贝叶斯信念网络(BBN)的硬岩TBM选择风险评估系统
机译:保险市场中具有多重风险的逆向选择。
机译:储层条件下高度非均质砾岩的两相流动可视化:地质碳储量的岩心规模研究
机译:利用数值模拟研究不良地质条件对Uluabat隧道单屏蔽TBm干扰的影响