首页> 外文会议>IEEE International Conference on Robotics and Automation >Close-down process scheduling of wafer residence time-constrained multi-cluster tools
【24h】

Close-down process scheduling of wafer residence time-constrained multi-cluster tools

机译:晶圆停留时间约束多簇工具的关闭处理调度

获取原文

摘要

Semiconductor manufacturing industry has adopted multi-cluster tools as wafer fabrication equipment that is extraordinarily pricey but highly attractive owing to their higher productivity than single cluster tools can achieve. A challenging issue is how to schedule these tools. It is especially difficult to schedule their frequently occurring close-down processes subject to wafer residency constraints. Such processes appear frequently as caused by wafer lot switches and preventive and emergency maintenances. They are dynamical and non-cyclic. We analyze the synchronization conditions for multiple robots to perform concurrent activities. Upon these conditions, for the situations that an optimal schedule can be found in the steady state, a linear program model is proposed to find a feasible and optimal schedule for close-down processes. An example shows the application and efficiency of our proposed method.
机译:半导体制造业采用多簇工具作为晶圆制造设备,这是由于其比单簇工具更高的生产力,这是非常昂贵但高度吸引力。有挑战性的问题是如何安排这些工具。特别困难地安排经常发生的关闭流程,受晶圆居住限制。这种过程频繁出现是由晶圆批次开关和预防性和紧急维持引起的。它们是动态和非循环的。我们分析多个机器人的同步条件以执行并发活动。在这些条件下,对于在稳定状态下可以找到最佳时间表的情况,提出了线性程序模型,以找到用于关闭过程的可行性和最佳的时间表。一个例子显示了我们提出的方法的应用和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号