首页> 外文期刊>Automatica Sinica, IEEE/CAA Journal of >Optimal integrated schedule of entire process of dual-blade multi-cluster tools from start-up to close-down
【24h】

Optimal integrated schedule of entire process of dual-blade multi-cluster tools from start-up to close-down

机译:从启动到关闭的双刀片多集群工具全过程的最佳集成时间表

获取原文
获取原文并翻译 | 示例
       

摘要

Multi-cluster tools are widely used in majority of wafer fabrication processes in semiconductor industry. Smaller lot production, thinner circuit width in wafers, larger wafer size, and maintenance have resulted in a large quantity of their start-up and close-down transient periods. Yet, most of existing efforts have been concentrated on scheduling their steady states. Different from such efforts, this work schedules their transient and steady-state periods subject to wafer residency constraints. It gives the schedulability conditions for the steady-state scheduling of dual-blade robotic multi-cluster tools and a corresponding algorithm for finding an optimal schedule. Based on the robot synchronization conditions, a linear program is proposed to figure out an optimal schedule for a start-up period, which ensures a tool to enter the desired optimal steady state. Another linear program is proposed to find an optimal schedule for a close-down period that evolves from the steady state period. Finally, industrial cases are presented to illustrate how the provided method outperforms the existing approach in terms of system throughput improvement.
机译:多集群工具广泛应用于半导体行业的大多数晶圆制造工艺中。较小的批量生产,较薄的晶片电路宽度,较大的晶片尺寸以及维护,导致了它们大量的启动和关闭瞬态周期。但是,大多数现有的努力都集中在安排其稳态上。与此类工作不同的是,这项工作安排了受晶圆驻留限制的瞬态和稳态周期。它给出了双刀片机器人多集群工具稳态调度的可调度性条件,以及找到最佳调度的相应算法。根据机器人的同步条件,提出了一个线性程序,以找出启动周期的最佳时间表,从而确保工具进入所需的最佳稳态。提出了另一个线性程序来为从稳态时期演变而来的关闭时期找到最佳计划。最后,通过工业案例来说明所提供的方法在系统吞吐量提高方面如何胜过现有方法。

著录项

  • 来源
    《Automatica Sinica, IEEE/CAA Journal of》 |2019年第2期|553-565|共13页
  • 作者

    Qinghua Zhu; Yan Qiao; Naiqi Wu;

  • 作者单位

    School of Computer Science and Technology Guangdong University of Technology Guangzhou 510006 China and also with the Helen and John C. Hartmann Department of Electrical and Computer Engineering New Jersey Institute of Technology Newark NJ 07102 USA;

    Institute of Systems Engineering Macau University of Science and Technology Taipa Macau China;

    Institute of Systems Engineering Macau University of Science and Technology Taipa Macau China and also with the National Key Laboratory of Precise Electronic Manufacturing Technology and Equipment Guangdong University of Technology Guangzhou 510006 China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Tools; Optimal scheduling; Robots; Steady-state; Transient analysis; Schedules; Job shop scheduling;

    机译:工具;最佳调度;机器人;稳定状态;瞬态分析;时间表;作业车间调度;
  • 入库时间 2022-08-18 04:35:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号