Optimal Integrated Schedule of Entire Process of Dual-blade Multi-cluster Tools From Start-up to Close-down

机译:从启动到关闭的双刀片多集群工具整个过程的最佳集成时间表

获取原文
获取原文并翻译 | 示例
       

摘要

Multi-cluster tools are widely used in majority of wafer fabrication processes in semiconductor industry. Smaller lot production, thinner circuit width in wafers, larger wafer size, and maintenance have resulted in a large quantity of their start-up and close-down transient periods. Yet, most of existing efforts have been concentrated on scheduling their steady states.Different from such efforts, this work schedules their transient and steady-state periods subject to wafer residency constraints. It gives the schedulability conditions for the steady-state scheduling of dual-blade robotic multi-cluster tools and a corresponding algorithm for finding an optimal schedule. Based on the robot synchronization conditions, a linear program is proposed to figure out an optimal schedule for a start-up period, which ensures a tool to enter the desired optimal steady state. Another linear program is proposed to find an optimal schedule for a closedown period that evolves from the steady state period. Finally,industrial cases are presented to illustrate how the provided method outperforms the existing approach in terms of system throughput improvement.
机译:多集群工具广泛应用于半导体行业的大多数晶圆制造工艺中。较小的批量生产,较薄的晶片电路宽度,较大的晶片尺寸以及维护,导致了它们大量的启动和关闭瞬态周期。然而,现有的大多数工作都集中在调度其稳态上,与这种努力不同的是,这项工作根据晶圆驻留限制来调度其瞬态和稳态周期。它给出了双刀片机器人多集群工具稳态调度的可调度性条件,并给出了寻找最佳调度的相应算法。根据机器人的同步条件,提出了一个线性程序来找出启动阶段的最佳计划,以确保工具进入所需的最佳稳态。提出了另一个线性程序,以找到从稳态时期演变而来的停机时期的最佳计划。最后,通过工业案例来说明所提供的方法在系统吞吐量提高方面如何胜过现有方法。

著录项

  • 来源
    《自动化学报:英文版》 |2019年第002期|P.553-565|共13页
  • 作者

    Qinghua Zhu; Yan Qiao; Naiqi Wu;

  • 作者单位

    [1]IEEE;

    [2]the School of Computer Science and Technology,Guangdong University of Technology,Guangzhou 510006,China,and also with the Helen and John C.Hartmann Department of Electrical and Computer Engineering,New Jersey Institute of Technology,Newark NJ 07102,USA;

    [1]IEEE;

    [3]the Institute of Systems Engineering,Macau University of Science and Technology,Taipa,Macau,China;

    [1]IEEE;

    [4]the Institute of Systems Engineering,Macau University of Science and Technology,Taipa,Macau,China,and also with the National Key Laboratory of Precise Electronic Manufacturing Technology and Equipment,Guangdong University of Technology,Guangzhou 510006,China;

  • 收录信息 中国科学引文数据库(CSCD);
  • 原文格式 PDF
  • 正文语种 CHI
  • 中图分类 机器人;
  • 关键词

    Multi-cluster tools; robots; scheduling transient periods; semiconductor manufacturing systems;

    机译:多集群工具;机器人;计划过渡期;半导体制造系统;
  • 入库时间 2022-08-19 04:28:32
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号