首页> 外文会议>International symposium in new trends and guidelines on dam safety >Rehabilitation of the Bajina Basta dam left abutment
【24h】

Rehabilitation of the Bajina Basta dam left abutment

机译:Bajina Basta Dam的康复留下基台

获取原文

摘要

Due to the occurrence of considerable cracks in the buttress walls of the hollow gravity dam, a qualitative and numerical analysis of the problem has been carried out. The analysis is essentially based on the application of the numerical models computed for all relevant loading. A comparison of the numerical analyses results with the actual state and measurements on the dam has led to the elimination of the potential problem causes, but the confirmation of the other possible crack causes. The dam treatment ensures the future structural stability of this dam type. The rehabilitation with some characteristic details was shown in this paper.
机译:由于空心重力坝的支撑壁中发生了相当大的裂缝,已经进行了对问题的定性和数值分析。该分析基本上基于应用于所有相关加载的数值模型的应用。数值分析的比较结果与大坝上的实际状态和测量导致消除潜在的问题原因,而是确认其他可能的裂缝原因。大坝处理确保了这种坝型的未来结构稳定性。本文显示了具有一些特征细节的康复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号