首页> 外文会议>Annual Conference and Expo of the Institute of Industrial Engineers >Survey Development for a Study of the Effects of CI Tools and Implementation Practices on Hospital Performance
【24h】

Survey Development for a Study of the Effects of CI Tools and Implementation Practices on Hospital Performance

机译:研究CI工具和实施实践对医院绩效影响的研究

获取原文

摘要

A survey was developed to measure the relationship between continuous improvement (CI) implementation practices, the use of specific continuous improvement tools, and hospital performance as measured by room prep time, patient costs per day, lab result wait times, reportable errors, patient satisfaction, and employee satisfaction. The survey included four sections: 1) a section for demographic information, 2.) a two-part yes/no section on CI activities, 3) a section of 34 yes/no questions on CI tool usage, and 4) a section with three open-ended questions on CI activities. A 14-step process was developed for survey administration and is also described.
机译:开发了一项调查,以衡量持续改进(CI)实施实践之间的关系,使用房间准备时间测量的特定连续改进工具,以及医院性能,每天患者成本,实验室结果等待时间,可报告错误,患者满意度 和员工满意度。 该调查包括四个部分:1)人口统计信息的一节,2.)关于CI活动的两部分是/否部分,3)关于CI工具使用的34个是/否问题,4)部分 关于CI活动的三个开放式问题。 为调查管理开发了一个14步过程,并还描述了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号