Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management

机译:项目管理模型:在挣值管理中集成挣得进度,质量和风险

获取原文

摘要

Earned Value Management (EVM) has been widely used as a project monitoring and control tool for projects due to its practical applications. This study integrates earned schedule, quality management, and risk management into earned value management to address the weaknesses and limitations of the traditional EVM and proposes a new project management model. The proposed model was tested in a sample bicycle project in order to validate its application. The proposed model was able to show how the quality problem affects the cost and schedule risk of a project with the quality performance metrics. The preventive actions made are also reflected in the risk indices as the project progresses. The proposed model also made the schedule delays more explicit and easy to understand since it shows the real time delay.
机译:挣值管理(EVM)由于其实际应用而被广泛用作项目的项目监视和控制工具。这项研究将赢得进度,质量管理和风险管理整合到了挣值管理中,以解决传统EVM的弱点和局限性,并提出了一种新的项目管理模型。为了验证其应用,在示例自行车项目中对提出的模型进行了测试。所提出的模型能够显示质量问题如何通过质量绩效指标来影响项目的成本和进度风险。随着项目的进展,所采取的预防措施也将反映在风险指数中。该模型还显示了实时延迟,因此也使调度延迟更加明确和易于理解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号