Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management

机译:项目管理模式:赢得价值管理中赚取的时间表,质量和风险集成

获取原文

摘要

Earned Value Management (EVM) has been widely used as a project monitoring and control tool for projects due to its practical applications. This study integrates earned schedule, quality management, and risk management into earned value management to address the weaknesses and limitations of the traditional EVM and proposes a new project management model. The proposed model was tested in a sample bicycle project in order to validate its application. The proposed model was able to show how the quality problem affects the cost and schedule risk of a project with the quality performance metrics. The preventive actions made are also reflected in the risk indices as the project progresses. The proposed model also made the schedule delays more explicit and easy to understand since it shows the real time delay.
机译:由于其实际应用,赚取的价值管理(EVM)已被广泛用作项目监控和控制工具。本研究将赢取的时间表,质量管理和风险管理纳入赢得价值管理,以解决传统EVM的弱点和局限性,并提出了一个新的项目管理模式。在样品自行车项目中测试了所提出的模型,以验证其应用。拟议的模型能够展示质量问题如何影响项目与质量性能指标的成本和日程风险。随着项目进展的进展,所取得的预防行动也反映在风险指标中。拟议的模型还使计划延迟更明确和易于理解,因为它显示了实时延迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号