首页> 外国专利> INTEGRATED CO_2-COST-SCHEDULE MANAGEMENT SYSTEM AND METHOD FOR BUILDING CONSTRUCTION PROJECTS USING EARNED VALUE MANAGEMENT THEORY

INTEGRATED CO_2-COST-SCHEDULE MANAGEMENT SYSTEM AND METHOD FOR BUILDING CONSTRUCTION PROJECTS USING EARNED VALUE MANAGEMENT THEORY

机译:基于挣值管理理论的CO_2成本计划集成管理系统及方法

摘要

The integrated CO_2-cost-schedule management system for building construction projects of the present invention comprises: a project schedule creating unit for referring to management accounts and creating a project schedule plan based on information related to a precedence relation by management account and working hours; a building construction cost calculating unit for calculating a building construction cost used in a construction process of each management account; a CO_2 emission volume calculating unit for calculating a CO_2 emission volume caused in the construction process of each management account; a reference line creating unit for an earned value measurement for building a plan curve for each management account based on the project schedule; a weighted value calculating unit by management account for calculating a building construction schedule weighted value, a CO_2 emission volume weighted value, and a cost weighted value respectively for each management account, calculating an integrated CO_2 emission volume-schedule weighted value based on the construction schedule weighted value and the CO_2 emission volume weighted value for each management account, and calculating an integrated cost-schedule weighted value based on the building construction schedule weighted value and the cost weighted value; and an earned value analyzing unit for measuring measurement elements of each management account, calculating a weighted result value, and drawing analysis elements including at least a weighted schedule earned value index and a weighted cost earned value index based on the calculated plan value, weighted result value, and execution value.;COPYRIGHT KIPO 2015
机译:本发明的用于建筑施工项目的综合CO_2成本进度计划管理系统包括:项目进度计划创建单元,用于参考管理账户并基于与管理账户和工作时间有关的优先级关系的信息来创建项目进度计划;以及房屋建筑成本计算单元,用于计算在每个管理账户的建造过程中使用的房屋建筑成本; CO_2排放量计算单元,用于计算在每个管理账户的建设过程中产生的CO_2排放量;挣值测量的参考线创建单元,用于基于项目进度表为每个管理帐户构建计划曲线;管理帐户的加权值计算单元,用于分别计算每个管理帐户的建筑施工进度表加权值,CO_2排放量加权值和成本加权值,并根据施工进度表计算综合的CO_2排放量进度表加权值每个管理账户的加权值和CO_2排放量加权值,并根据建筑施工进度表加权值和成本加权值计算出综合成本进度表加权值;收益值分析单元,用于测量每个管理账户的计量要素,计算加权结果值,以及基于计算出的计划值,加权结果,至少包括加权计划收益值指标和加权成本收益值指标的绘图分析要素价值和执行价值。; COPYRIGHT KIPO 2015

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号