首页> 外文期刊>Australasian Journal of Construction Economics and Building >A study of best management practices for enhancing productivity in building projects: construction methods perspectives
【24h】

A study of best management practices for enhancing productivity in building projects: construction methods perspectives

机译:旨在提高建筑项目生产率的最佳管理实践研究:施工方法观点

获取原文
           

摘要

This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.
机译:这项研究调查了可能通过关注施工方法来提高建筑项目生产率的管理实践。在研究的第一阶段,与19名专家进行了面对面的访谈,以确定最佳的施工方法管理方法。定性数据分析已达到饱和,并得出了与当地行业相关的施工方法的最佳实践清单。第二阶段使用了行业范围内的调查来确定最佳实践的优先级。因此,项目启动计划,交通控制计划,机械定位策略,项目完成计划和动态场地布置计划被证明是施工方法的前五名最佳实践。该研究还表明,最佳实践的高水平实施与项目延迟低水平相关。最佳实践的使用也根据项目成本而有所不同。前五种最佳实践之间没有明显的差异。作者建议应共同实施它们,以提高建筑项目的生产率。承包商可以使用开发的逻辑回归模型来预测超过基准生产率因子的可能性,并在此基础上采取纠正措施以达到所需的生产率水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号