3-Dimensional Numerical Modelling of a Deep Basement Excavation Adjacent to Rail Tunnels and Geological Fault Zone in Sydney CBD

机译:悉尼CBD铁路隧道和地质断裂带附近的深地下室开挖的三维数值模拟

获取原文
获取原文并翻译 | 示例

摘要

A geotechnical 3-dimensional analysis was undertaken to assess the impacts of a proposed basementrnexcavation and ground loadings for a retail and commercial redevelopment site in Sydney CBD onrnexisting rail tunnels. There is a known presence of a geological fault zone and an area of additionalrnjointing parallel to the fault zone which traverses the site. The design of the retention system for thernexcavation boundary was not finalised and therefore reasonable assumptions of the behaviour of thernretention system had to be made. Geotechnical analysis was carried out to assess the changes in railrntunnel stresses and likely deformation induced by the proposed redevelopment. The analysisrnassesses the potential impacts of the relief of relatively high in-situ horizontal locked in stresses in thernHawkesbury Sandstone and the lateral movements of the excavated faces on the tunnel behaviour.
机译:进行了岩土3维分析,以评估拟议的地下室开挖和地面荷载对悉尼CBD上不存在的铁路隧道的零售和商业重建场所的影响。已知存在一个地质断层带和一个平行的,贯穿断层带的平行于断层带的附加区域。挖掘边界的保留系统的设计尚未最终确定,因此必须对保留系统的行为做出合理的假设。进行了岩土工程分析,以评估拟议的重建工程引起的铁路隧道应力的变化以及可能产生的变形。该分析评估了在霍克斯伯里砂岩中的应力中相对较高的原位水平锁定的释放以及隧道行为对开挖面的横向运动的潜在影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号