首页> 外文会议>Computer Distributed Control and Intelligent Environmental Monitoring (CDCIEM), 2012 International Conference on >Analysis of Strengthening Plan and Construction Control Points of Single Box Single Room Prestressed Concrete Continuous Box Girder Bridge
【24h】

Analysis of Strengthening Plan and Construction Control Points of Single Box Single Room Prestressed Concrete Continuous Box Girder Bridge

机译:单箱单室预应力混凝土连续箱梁桥加固方案及施工控制要点分析

获取原文
获取原文并翻译 | 示例

摘要

Due to a variety of factors one province builted 5×45m single box single room prestressed concrete continuous box girder bridge that have used 8 years, and it appeared crack and concrete-flake-off, moreover, it reduced the bearing capacity of the bridge and threat the normal use of the bridge seriously. This paper briefly describes the construction method about how to maintain the bridge, and it gives reference to construction of this kind engineering.
机译:由于种种因素,一个省建了一个使用了8年的5×45m单箱单室预应力混凝土连续箱梁桥,出现了裂缝和混凝土剥落现象,降低了桥梁的承载能力。严重威胁桥梁的正常使用。本文简要介绍了桥梁的维护方法,为此类工程的建设提供了参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号