首页> 外文会议>Communication Systems and Network Technologies (CSNT), 2012 International Conference on >Coordinate Preference DEA Method of Software Project Risk Assessment
【24h】

Coordinate Preference DEA Method of Software Project Risk Assessment

机译:软件项目风险评估的协调偏好DEA方法

获取原文
获取原文并翻译 | 示例

摘要

In this paper, Considering both positive(preference value is bigger and better) and negative(preference value is smaller and better) factors that affect the risk of software project risk assessment, The coordinate preference risk assessment model of software project based on DEA is established. Conception of risk surface is provided. By introducing fuzzy comprehensive evaluation method based on entropy weight, improved the method of sorting risk by moving risk surface. In the last section, the numerical example is given to verify feasible and valid of the result. This method is not only applicable for software project risk assessment, but also for other similar problems.
机译:本文同时考虑了影响软件项目风险评估风险的正向(偏好值越大越好)和负向(偏好值越小越好)两个因素,建立了基于DEA的软件项目协调偏好风险评估模型。 。提供了风险面的概念。通过引入基于熵权的模糊综合评价方法,改进了通过移动风险面进行风险分类的方法。在最后一部分中,给出了数值示例,以验证结果的可行性和有效性。该方法不仅适用于软件项目风险评估,还适用于其他类似问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号