首页> 外文会议>Advances in computational environment science >Reconstruction of InSAR DEM Using ERS-1/2 Interferogram and SRTM Data*
【24h】

Reconstruction of InSAR DEM Using ERS-1/2 Interferogram and SRTM Data*

机译:使用ERS-1 / 2干涉图和SRTM数据重建InSAR DEM *

获取原文
获取原文并翻译 | 示例

摘要

Though the Interferometric Synthetic Aperture Radar (InSAR) processing can produce Digital Elevation Model (DEM), the accuracy of the InSAR derived DEM need to be improved because of the impact of phase errors. To solve this problem, we propose a new approach which includes three steps. Firstly we estimate the baseline and utilize precise orbit data to obtain higher co-registration accuracy. Then we model and remove phase trends via linear regression analysis before converting phase to height with critical points selected in high coherence regions. Finally the interferometric phase in low coherence regions is stimulated with the use of SRTM DEM. One pair of ERS-1/2 images and SRTM data covering the mountainous region in central China is utilized in this work. The experiment shows the effectiveness of our approach.
机译:尽管干涉式合成孔径雷达(InSAR)处理可以产生数字高程模型(DEM),但由于相位误差的影响,需要提高InSAR导出的DEM的精度。为了解决这个问题,我们提出了一种新的方法,该方法包括三个步骤。首先,我们估算基线并利用精确的轨道数据来获得更高的共配准精度。然后,我们通过线性回归分析对相位趋势进行建模和移除,然后在高相干区域中选择临界点将相位转换为高度。最后,使用SRTM DEM可以激发低相干区域中的干涉相。这项工作使用了一对覆盖中国中部山区的ERS-1 / 2图像和SRTM数据。实验证明了我们方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号