The equipment is also for free-flowing materials, being particularly for loading and unloading oil tankers. It has two boom pipes coupled by a swivel joint with a horizontal axis while the inner one also slews and derricks on a fixed vertical mounting, and has a rearwards extending pivoting arm with a tailweight. This counterbalances both pipes as well as the outer one, being coupled to the outer one by a rope drive so that when in the rest position the weight is held in the top dead centre position. There is an additional adjustment weight, which can be slid along the inner pipe. This weight can either be in the form of a sleeve sliding on the pipe itself, or can work on a guide bar parallel to it.
展开▼