首页> 外国专利> Concrete road or runway construction - completes main slab section first, with intermediary clamps, which contact head edges between which expansion joint fits

Concrete road or runway construction - completes main slab section first, with intermediary clamps, which contact head edges between which expansion joint fits

机译:混凝土道路或跑道的建造-首先用中间夹钳完成主平板的截面,中间夹钳与头部边缘接触,膨胀缝之间固定

摘要

Preparation method for a road covering (1) uses at least one series of concrete moulded slabs (3) separated from each other by an expansion joint (2). In the lengthways direction of the concrete slab, clamps are fitted with anchors on the mould beams, and after at least part hardening of the concrete, the clamps are tightened up against the concrete and anchored to corresponding anchors of adjacent expansion seams. Firstly, a main section (9) of at least one slab is prepared, on to which section a head edge (10), completing the slab and limited by the expansion joint (2), is formed. Whilst this is being done, the clamps (11) are temporarily anchored by intermediary anchors (8) between main section and head edge. Afterwards, all clamps are tightened and anchored with sufficient tension to draw the intermediary anchors from their locations.
机译:道路覆盖物(1)的制备方法使用至少一系列通过膨胀缝(2)彼此分开的混凝土模压板(3)。在混凝土板的纵向方向上,夹具在模梁上装有锚固件,并且在混凝土至少部分硬化之后,将夹具紧固到混凝土上并锚固到相邻膨胀缝的相应锚固件上。首先,准备至少一个板的主体部分(9),在该部分上形成完成该板并受到膨胀接头(2)限制的头部边缘(10)。在进行此操作的同时,夹具(11)由中间部分(8)临时固定在主体部分和头部边缘之间。然后,将所有夹具拧紧并以足够的张力锚固,以将中间锚从其位置拉出。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号