首页> 外国专利> Procedure for the optimization of the closing time of level crossings

Procedure for the optimization of the closing time of level crossings

机译:优化平交道口关闭时间的程序

摘要

The method involves, on detecting a request (Anf. 1) from a second train (Z2) approaching the crossing and before switching on the crossing for a first transition, delaying a train (Z1) which would usually be first to switch-on/reach the crossing so that the switch-on/occupation time occurs at the earliest at the switch-on time and its switch-off/vacation time at the latest at the switch-off time of the other train passing through the crossing.
机译:该方法包括:在检测到来自接近该交叉口的第二列车(Z2)的请求(Anf.1)之前,在为第一个过渡接通该交叉口之前,延迟通常会首先接通/打开的列车(Z1)/到达交叉路口,因此接通/占用时间最早在接通时间发生,而其断开/腾空时间最晚在经过该交叉路口的另一列火车的断开时间发生。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号