首页>
外国专利>
POLE CONSTRUCTION METHOD WHICH CONCEALS THE LOWER PART OF A POLE IN THE GROUND
POLE CONSTRUCTION METHOD WHICH CONCEALS THE LOWER PART OF A POLE IN THE GROUND
展开▼
机译:隐蔽地面下部的立杆构造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A pole construction method is provided to bury the bottom of a pole and to minimize the buried part by blocking the infiltration of water into between the pole and the base.;CONSTITUTION: A pole construction method comprises a step of manufacturing a base(10) having a protrusion(15) to form a burying space(17), a step of installing a pole such as street light, security light, milestone, sign post, and traffic signal in the burying space, a step of placing a sealant in the burying space, and a step of hardening the sealant.;COPYRIGHT KIPO 2010
展开▼