首页> 外国专利> SOIL IMPROVEMENT METHOD BY SOLIDIFICATION PILE SITE PREPARATION

SOIL IMPROVEMENT METHOD BY SOLIDIFICATION PILE SITE PREPARATION

机译:凝固桩现场整治土壤的方法

摘要

PROBLEM TO BE SOLVED: To provide a soil improvement method by solidification pile site preparation which can develop high-strength solidification pile of stable quality without being influenced by original position soil in soil improvement work.;SOLUTION: A supply material is formed by mixing an aggregate such as gravel, crushed stones or the like with cement milk at a predetermined mixing ratio by a hopper 7 attached at the top of a casing pipe 4 by using a soil improvement construction machine provided with the casing pipe 4 which can be inserted in the ground. Then the supply material, which is formed by mixing the aggregate such as gravel, crushed stones or the like with cement milk at a predetermined mixing ratio, is charged from the hopper 7 into the casing pipe 4, and the casing pipe 4 is inserted in the ground. Then pull-out/back pouring is repeated while discharging the supply material from the inserted casing pipe 4, and the solidification pile is prepared in the ground. Thus, the soft ground can be improved into the stable ground by the soil improvement method by solidification pile site preparation.;COPYRIGHT: (C)2010,JPO&INPIT
机译:解决的问题:提供一种通过凝固桩现场准备的土壤改良方法,该方法可以开发稳定质量的高强度凝固桩,而不受土壤改良工作中原始位置的影响。通过使用设置在套管4的顶部的土壤改良施工机,通过安装在套管4的顶部的料斗7,以预定的混合比,将诸如砾石,碎石等的骨料与水泥乳一起以预定的混合比使用。地面。然后,通过将诸如砾石,碎石之类的骨料与水泥乳以预定的混合比混合而形成的供应材料从料斗7注入到套管4中,并将套管4插入其中。地面。然后,在从插入的套管4中排出供给材料的同时,反复进行拉出/倒出,并在地下准备凝固桩。因此,通过固化桩现场准备的土壤改良方法,可以将软土地基改良为稳定地基。;版权所有:(C)2010,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号