首页> 外国专利> The concrete raceway laying manner which uses the concrete block which is produced by the production manner and this manner of the concrete block which possesses 3 dimensional three-dimensional form

The concrete raceway laying manner which uses the concrete block which is produced by the production manner and this manner of the concrete block which possesses 3 dimensional three-dimensional form

机译:使用通过该生产方式生产的混凝土砌块的混凝土跑道铺设方式以及具有3维三维形状的混凝土砌块的这种方式

摘要

To measure the plane surface alignment on of site, and the planned alignment which considers gradient and cant the plane surface alignment and the symmetrical plane surface which the 1st temporary assembly base are measured being linear and to array large number, to install the 1st temporary carriage rail in the 1st temporary assembly base, as been able to have gradient and the cant which correspond to the measurement result between 1st temporary carriage rail mutual, adjust, to install the many 1st molding box on the 1st temporary carriage rail, arraying alongside the 1st temporary carriage rail, try to be able to have gradient and the cant which correspond to the measurement result, according to the length direction of the 1st temporary carriage railInstalling the 2nd molding box of the deck, it closes the upper part side of the 1st molding box, outside the 1st temporary assembly base the 2nd temporary assembly base the plane surface which corresponds with the 1st temporary assembly base being linear, it arrays large number, installs the 2nd temporary carriage rail in the 2nd temporary assembly base, as been able to have the vertical alignment and the symmetrical vertical alignment of the roadbed, it adjusts, placing does the concrete, with the finisher the concrete surface, forms alongside the 2nd temporary carriage rail, the concrete cures, the concrete after separating from the 1st and 2nd molding box, it turns over. Choice figure Drawing 2
机译:为了现场测量平面对准,并考虑坡度和倾斜平面的对准,以及将第一个临时组装基座测量为线性并排列成大量的对称平面,以安装第一个临时托架在第一临时装配基座中的导轨,由于能够在第一临时支架导轨之间具有与测量结果相对应的倾斜度和倾斜度,相互调节,在第一临时支架导轨上安装多个第一成型盒,并与第一临时支架并排布置临时滑轨,根据第一个临时滑轨的长度方向,尝试使之具有与测量结果相对应的坡度和倾斜度,安装甲板的第二造型箱,将第一造型的上部关闭盒子,在第一临时装配基座的外面,第二临时装配基座的与第一临时装配对应的平面基座为线性,它排列成排,在第二临时装配基座中安装第二临时滑轨,因为能够具有路基的垂直对齐和对称的垂直对齐,它可以调整,放置混凝土,用修整器混凝土表面,沿着第二临时滑轨形成,混凝土固化,将混凝土从第一和第二造型箱中分离出来后翻转。<选择图>图2

著录项

  • 公开/公告号JP2014510855A

    专利类型

  • 公开/公告日2014-05-01

    原文格式PDF

  • 申请/专利权人 カン ナムフン;カン ナムフン;

    申请/专利号JP20130557625

  • 发明设计人 カン ナムフン;

    申请日2011-06-21

  • 分类号E01B1/00;E01B3/28;

  • 国家 JP

  • 入库时间 2022-08-21 16:14:27

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号