首页>
外国专利>
Concrete raceway throb is formed, being the manner where the mannered null concrete raceway throb which lays the carriage rail raceway where at the same time the carriage rail raceway anchor component is interposed
Concrete raceway throb is formed, being the manner where the mannered null concrete raceway throb which lays the carriage rail raceway where at the same time the carriage rail raceway anchor component is interposed
PROBLEM TO BE SOLVED: To provide a method of constructing a rail track on a concrete slab by using a small amount of continuously formed concrete.;SOLUTION: In the method of constructing the rail track, the concrete track slab 1 is produced and the rail track anchor members 3 are inserted in the track slab 1 by an inserter system 20 mobile along a route of the rail track includes the following steps; (a) using a machine for continuously pouring concrete to produce two concrete walls 2 laterally delimiting the edges of the track slab 1 to be poured; (b) pouring the concrete track slab 1 between the walls 2; and (c) using the inserter system 20 to insert the anchor member 3 in the freshly poured track slab 1, a tie plate inserter system being adjusted accurately by a measuring station, topographical survey points, a measuring system, and reflectors carried by the inserter system.;COPYRIGHT: (C)2003,JPO
展开▼