首页> 外文OA文献 >Examining the Impact of Pavement Rehabilitation Trigger Values and Annual Rehabilitation Funding on the Long-term Network-Level Pavement Condition: A Case Study with the Indiana State Urban Road Network
【2h】

Examining the Impact of Pavement Rehabilitation Trigger Values and Annual Rehabilitation Funding on the Long-term Network-Level Pavement Condition: A Case Study with the Indiana State Urban Road Network

机译:检查路面修复触发值和年度修复资金对长期网络水平路面状况的影响:以印第安纳州立城市道路网为例

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Management of highway assets, including pavements, is immensely challenging in an era of uncertain funding for transportation agencies and higher service expectations from the public. Furthermore, the maintenance of pavement assets in good serviceable condition is one of the most cost-intensive operations for a highway agency.Between 1996 and 2008, the Indiana DOT spending on improvement of pavement assets fluctuated between 35% and 50% of its asset management budget annually (Everett2012). Therefore, pavement managers are constantly exploring strategies to fulfill their mission of maintaining roads in good condition with the minimumbudget. Strategies may include examining the effectiveness of individual pavement treatments or assessing approaches to prioritizing pavement needs for fund allocation.A network-level approach for cost control that remains to be examined deeply is the change in trigger policy for pavement project implementation. Changes in the trigger policy undoubtedly have an influence on the budget that will be required and the resulting pavement conditions at the network level. A pavement treatment threshold modification strategy would aid agencies in the face of budget restriction. However, implementation of such a strategy would have to occur only after projection of the long-term influence of a certain treatment trigger policy on the pavement conditions at the network level.This paper explores the impact of changing the pavement rehabilitation trigger policy and varying the available budget on pavement roughness condition at the network-level. The Indiana State Urban road network is used as a case study.
机译:在不确定的运输机构资金和公众对服务的更高期望的时代,公路资产(包括人行道)的管理面临着巨大的挑战。此外,使路面资产处于良好可使用状态的维护是公路代理机构成本最高的操作之一.1996年至2008年之间,印第安纳州DOT在改善路面资产方面的支出在其资产管理的35%至50%之间波动每年预算(Everett2012)。因此,路面管理者正在不断探索策略,以最小的预算来完成其使道路保持良好状态的任务。策略可能包括检查各个人行道处理的有效性或评估将人行道需求划分为资金分配优先级的方法。仍然需要深入研究的网络级成本控制方法是人行道项目实施触发政策的变化。触发策略的更改无疑会影响所需的预算以及网络级别的铺装条件。路面处理阈值修改策略将在预算受限的情况下帮助机构。但是,只有在预测某种处理触发策略对网络水平的路面状况的长期影响之后,才必须实施这种策略。本文探讨了更改路面修复触发策略和改变路面触发策略的影响。网络级路面不平整状况的可用预算。以印第安纳州城市道路网为例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号