首页> 外文OA文献 >Inside the “Black Box” of River Restoration: Using Catchment History to Identify Disturbance and Response Mechanisms to Set Targets for Process-Based Restoration
【2h】

Inside the “Black Box” of River Restoration: Using Catchment History to Identify Disturbance and Response Mechanisms to Set Targets for Process-Based Restoration

机译:在河流修复的“黑匣子”内部:使用集水历史来识别干扰和响应机制,为基于过程的修复设定目标

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Many river restoration projects fail. Inadequate project planning underpins many of the reasons given for failure (such as setting overly ambitious goals; selecting inappropriate sites and techniques; losing stakeholder motivation; and neglecting to monitor, assess, and document projects). Another major problem is the lack of an agreed guiding image to direct the activities aimed at restoring the necessary biophysical and ecological processes within the logistic constraints of on-ground works. Despite a rich literature defining the components of restoration project planning, restoration ecology currently lacks an explicit and logical means of moving from the initial project vision through to on-ground strategies. Yet this process is fundamental because it directly links the ecological goals of the project to the on-ground strategies used to achieve them. We present a planning process that explicitly uses an interdisciplinary mechanistic model of disturbance drivers and system responses to build from the initial project vision to the implementation of on-ground works. A worked example on the Upper Hunter River in southeastern Australia shows how understanding catchment history can reveal disturbance and response mechanisms, thus facilitating process-based restoration.
机译:许多河流修复项目失败。项目计划不充分是导致失败的许多原因的根源(例如设定过于雄心勃勃的目标;选择不合适的地点和技术;失去利益相关者的积极性;以及忽略监视,评估和记录项目)。另一个主要问题是缺乏商定的指导形象来指导旨在恢复在地面工作的后勤约束内必要的生物物理和生态过程的活动。尽管有丰富的文献来定义恢复项目计划的组成部分,但恢复生态系统目前缺乏从最初的项目构想过渡到实际策略的明确且合乎逻辑的方法。然而,此过程至关重要,因为它将项目的生态目标与实现这些目标的实际策略直接联系在一起。我们提出了一个规划过程,该过程明确使用了干扰驱动程序和系统响应的跨学科机制模型,以构建从最初的项目构想到地面工作的实施。在澳大利亚东南部的上亨特河上的一个工作实例表明,了解流域历史可以揭示干扰和响应机制,从而促进基于过程的恢复。

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号