首页> 外文OA文献 >The Effectiveness Of Building Plan Approval. Case Study: Subang Jaya Municipal Council, Selangor
【2h】

The Effectiveness Of Building Plan Approval. Case Study: Subang Jaya Municipal Council, Selangor

机译:建筑计划批准的有效性。案例研究:梳子杰瓦市议会,雪兰莪

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The growth of construction activities in Malaysia has given rise to the need for more statutory controls to ensure systematic and orderly development. This process of statutory approval refers to obtaining permissions from the relevant authorities to ensure the development follows the standards laid down in the building regulations and certain stages of the construction are inspected by officers from the local authority. This effort is evidenced by the improvement of mechanism delivery system of building plan process, known as One Stop Centre (OSC). In fact, the building plan and construction permit approval come as the most important stage in development as it will determine the exact date for construction to start. However, relatively little is known about the effectiveness of building plan process in the local authority. Therefore, a study has been carried out to investigate the effectiveness of building plan approval process in Subang Jaya Municipal Council (MPSJ). A questionnaires survey has been conducted to forty-seven (47) respondents from the MPSJ’s internal technical departments that involved in the process. The respondents have mostly felt that the ineffectiveness of the building plan approval process was due to the incomplete documents submitted to the OSC, lack of knowledge among the Professional Submitting Person (PSP) and the incapability of staffs in handling development applications. Hence, the findings present a synthesis of results for town planners, architects, developers and government agencies to have a better understanding of how the effective and efficient building plan process can rationalize the success of property development sector. Thus, the knowledge serves as a basis for future strategic planning decisions and guidance in the delivery system in Malaysia.
机译:马来西亚建设活动的增长使得需要更多的法定管制,以确保系统和有序的发展。该法定批准的此过程是指有关当局的权限,以确保开发遵循建筑规定下规定的标准,并由当地当局的官员检查建设的某些阶段。通过改进建筑计划过程的机制输送系统,称为一个止动中心(OSC),这努力得到了证明。事实上,建筑计划和建筑许可证批准是发展中最重要的阶段,因为它将确定施工的确切日期开始。然而,关于在地方当局建造计划过程的有效性相对较少。因此,已经开展了一项研究,以调查梳子杰瓦市理事会(MPSJ)建设计划批准过程的有效性。调查问卷调查已经向第四十七(47)名受访者进行了来自MPSJ的内部技术部门,这些部门参与了该过程。受访者大多据认为,建筑计划批准过程的无效是由于提交奥硕的不完整文件,专业提交人员(PSP)中缺乏知识以及在处理开发申请方面的工作人员无法无法现成。因此,调查结果综合了城镇规划者,建筑师,开发商和政府机构的成果,以更好地了解有效和有效的建筑计划流程如何合理化房地产开发部门的成功。因此,知识作为在马来西亚交付系统中的未来战略规划决策和指导的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号