摘要

Power systems are currently witnessing a high wind-power penetration due to the development and commissioning of an increasing number of wind-power plants. This new scenario inevitably changes the way power systems are operated, mainly due to the uncertainties associated with wind, with the proper integration of this renewable energy source into the grid emerging as a new challenge. Unlike other highly flexible energy sources that can be used on demand according to the market needs, wind energy production is intermittent and non-dispatchable. In this context, transient stability analyses through the dynamic simulation of wind-turbine models and wind-power plants must be carried out. Moreover, as many countries have their own grid codes, the compliance requirements to connect wind farms to the network may be significantly different, depending on the specific region. In light of the above, this paper addresses the submission to Spanish Operation Procedure 12.3 (PO 12.3), for the first time, of one of the most advanced wind-turbine models, the generic Type 3 or doubly fed induction generator defined by the Western Electricity Coordinating Council (WECC) Second-Generation guidelines. The results show, on the one hand, the notable effect of the transformer inrush current, which influences the accuracy of the behavior of the generic wind-turbine model, and, on the other hand, the inability of the generic model to represent the transient periods of actual wind turbines. However, when the validation criteria is applied at the low-voltage measurement point, the WECC model fully complies with Spanish grid code PO 12.3.
机译:由于越来越多的风力电厂的开发和调试,电力系统目前目前见证了高风电渗透。这种新的场景不可避免地改变了电力系统的运行方式,主要是由于与风相关的不确定性,这种可再生能源的正确集成成为新挑战的网格。与可根据市场需求的需求使用的其他高度灵活的能源不同,风能生产是间歇性和不可批量的。在这种情况下,必须通过风力涡轮机模型的动态模拟来进行瞬态稳定性,必须进行风力电厂。此外,由于许多国家都有自己的网格代码,根据特定区域,将风电场连接到网络的合规要求可能会显着不同。鉴于以上,本文首次介绍了西班牙操作步骤12.3(PO 12.3)的提交,首次出现最先进的风力涡轮机模型之一,由西方定义的通用类型3或双馈馈电发电机之一电力协调委员会(WECC)第二代指南。结果显示,一方面,变压器浪涌电流的显着效果,这影响了通用风力涡轮机模型的行为的准确性,另一方面,通用模型无法代表瞬态实际风力涡轮机的时期。但是,当验证标准应用在低压测量点时,WECC模型完全符合西班牙网格码PO 12.3。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号