首页> 外文OA文献 >Reduction of the development cost for SHPP utilizing a container-type mini hydropower plants
【2h】

Reduction of the development cost for SHPP utilizing a container-type mini hydropower plants

机译:使用集装箱式小型水电站降低sHpp的开发成本

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

SHP (Small Hydropower Plant) Turija is a multipurpose infrastructure project (energy production, drinking water supply and irrigation) in Macedonia, which was originally designed as a conventional SHP. This design envisaged development of a SHP with installed capacity of only 150 kW and estimated annual energy generation of about 900 MWh, additionally providing about 200 l/s of drinking water for the nearby municipality of Strumica, and water quantities for irrigation purposes. ududThe feasibility study done for this project clearly demonstrated that if the project is implemented conventionally the development cost will be too large and that it would never be economically feasible. The developer of the project also had limits of the maximum available financing resources that he could raise for this project.ududThe final conclusions were that it is possible to make the project attractive and financially viable if and only if a complete redesign is undertaken adhere to the following constraints:udud•Minimizing the amount of civil works,ud•Having minor design modifications to the already existing structures that would results with insignificant changes on energy production/drinking/irrigation requirements,ud•Design relatively simple equipment that could work under various working conditions with net head difference from 30 to 60 m.ud•In order to reduce the equipment cost, procurement of the equipment outside Europe is allowed as long as appropriate quality requirements are maintained. ududThe re-design was performed and with replacement of the intended powerhouse with a container, the major civil and excavations works were eliminated. Moreover, as a result of the re-design the environmental impact was also reduced significantly. In addition, the impact on the surrounding users and structures, a constrain which previously was very important, now was significantly reduced and/or eliminated. The necessary construction area was reduced three times, and much of the standard equipment of the powerhouse (such as hoists) was eliminated. Finally, in same time a suitable Francis model turbine was found to fit better to the site conditions. ududThe procurement of the equipment nevertheless was rather challenging. Not many companies are interested to give offers for equipment of such small installed capacities, and if they are interested, their offers are with unreasonably high prices. Furthermore, it was requested by the producer that the SHP should be delivered and assembled in a standard shipping container. With big efforts, a renowned Chinese company was able to deliver the specified equipment within available budget. The complete construction time was fixed at 8 months (while with the conventional design, at least 12 months were necessary).ududFinally, the estimated cost of 500 k€ (based on the offers) for the construction of the SHP in conventional manner, was reduced to about 150 k€ by using the container type of SHP. The project was successfully commissioned in mid-December 2012, a half-month ahead of the schedule. ududThis paper presents the most important details of the re-design of the power plant, the achievements and the savings that were made with this innovative concept.ud
机译:SHP(小型水力发电厂)Turija是马其顿的多用途基础设施项目(能源生产,饮用水供应和灌溉),最初是作为常规SHP设计的。该设计设想了仅安装装机容量为150 kW的SHP,估计年发电量约为900 MWh,此外还为附近的Strumica市提供了约200 l / s的饮用水以及用于灌溉的水量。 ud ud为该项目所做的可行性研究清楚地表明,如果按常规实施该项目,开发成本将太大,并且从经济上讲是永远不可能的。该项目的开发人员还限制了他可以为该项目筹集的最大可用融资资源。 ud ud最终结论是,只有在进行了彻底的重新设计后,才有可能使该项目具有吸引力并在财务上可行。遵守以下约束条件: ud ud•尽量减少土建工程, ud•对现有结构进行较小的设计修改,从而对能源生产/饮用/灌溉要求的变化不大, ud•可以在各种工作条件下工作且净压差从30到60 m。 ud•的简单设备。为了降低设备成本,只要保持适当的质量要求,就可以在欧洲以外购买设备。 ud ud进行了重新设计,并用集装箱替换了预期的动力室,从而省去了主要的土建和挖掘工程。此外,由于重新设计,对环境的影响也大大减少了。此外,以前非常重要的约束对周围使用者和建筑物的影响现在已大大减少和/或消除。必要的建筑面积减少了三倍,并且消除了动力室的许多标准设备(例如起重机)。最后,与此同时,找到了合适的弗朗西斯模型涡轮机,使其更适合现场条件。 ud ud尽管如此,设备的采购还是颇具挑战性的。装机容量这么小的设备的公司报价不多,如果有兴趣,它们的报价会过高。此外,生产商要求将SHP交付并组装在标准的运输容器中。通过努力,一家中国知名公司能够在可用预算内交付指定的设备。整个施工时间固定为8个月(而采用常规设计,则至少需要12个月)。 ud ud最后,常规SHP的建造成本估计为50万欧元(根据报价)。通过使用SHP的容器类型,将其减少到约150 k€。该项目于2012年12月中旬成功调试,比原计划提前了半个月。 ud ud本文介绍了电厂重新设计的最重要细节,使用该创新概念所取得的成就和节省的费用。 ud

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号