首页> 外文期刊>Industrial Engineering Letters >Software Development for Estimating the Cost of Injuries and Man-hour Downtime in Hydropower Plant, Nigeria a Case Study
【24h】

Software Development for Estimating the Cost of Injuries and Man-hour Downtime in Hydropower Plant, Nigeria a Case Study

机译:估计尼日利亚水力发电厂的工伤成本和工时停机时间的软件开发案例研究

获取原文
           

摘要

This work understudied injuries/accidents in power generation plants in Nigeria. The work was based on the compilation of various hazards associated with individuals working in power plants, injuries/accidents exposed to and treatment given to the injured. The cost implication due to the accidents and man-hour lost were computed using the developed visual basic programming. Data regarding cases of injuries/accidents were collated for a given period in the power plants and used in the computation. It was discovered that a lot of financial losses were been incurred by the organizations due to injuries/accidents sustained by the workers in the process of carrying out their duties. The Visual Basic Programme developed was found to be versatile, easy to understand and suitable for the estimation of cost of injuries/accidents and man-hour losses in the power plants used as case studies. This programme can also be used to predict the cost of injuries/accidents in the sector even before they occur. Keywords: hydropower, injuries, accidents, man-hour, risks, visual basic
机译:这项工作研究了尼日利亚发电厂的伤害/事故。这项工作是基于对与在电厂工作的个人,受伤的人员/意外事故以及对受伤者进行治疗有关的各种危害的汇编。使用开发的Visual Basic程序计算了由于事故和工时损失造成的成本影响。在给定时期内,核对有关伤害/事故案例的数据,并将其用于计算中。人们发现,由于工人在履行职责过程中遭受的伤害/事故,这些组织蒙受了许多财务损失。发现开发的Visual Basic程序用途广泛,易于理解,适用于估算用作案例研究的电厂的伤害/事故成本和工时损失。该程序还可以用于预测该部门受伤/事故发生之前的成本。关键词:水电,伤害,事故,工时,风险,视觉基础

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号