首页> 美国政府科技报告 >Feasibility Study for Environmental Management Project at the Industrias Unidas, S.A. de C.V. (IUSA) Facilities. Final Report.
【24h】

Feasibility Study for Environmental Management Project at the Industrias Unidas, S.A. de C.V. (IUSA) Facilities. Final Report.

机译:Industrias Unidas,s.a。de C.V.环境管理项目的可行性研究(IUsa)设施。总结报告。

获取原文

摘要

The objectives of the study were to develop a system for wastewater treatment, increase recycling and minimize waste production, and to develop methods for restoration of contaminated soils, as well as surface and underground water by using the best available technologies for specific installations throughout the industrial group. Volume 2 contains the Final Report and is divided into: (1) Introduction; (2) Description Of The Study Area; (3) Wastewater; (4) Mogote Lagoon; (5) Phenolic Resins (6) Solid and Liquid Wastes; (7) Environmental Management Proposals; and (8) Costs, Benefits, And Financing Of Recommended Environmental Management Program.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号