首页> 美国政府科技报告 >Soil Nailing Inspectors Manual. Soil Nail Walls. Demonstration Project 103211 (Revised July 1998)
【24h】

Soil Nailing Inspectors Manual. Soil Nail Walls. Demonstration Project 103211 (Revised July 1998)

机译:土壤钉子检查员手册。土钉墙。示范项目103211(1998年7月修订)

获取原文

摘要

The purpose of this manual is to provide field inspectors with knowledge211u001enecessary to effectively monitor and document the construction of soil nail 211u001eretaining walls. The manual provides information useful to both the experienced 211u001eand inexperienced soil nail inspector. The manual is organized into two main 211u001eparts: Preconstruction Preparation and Construction Inspection. Checklists are 211u001eprovided throughout the Construction Inspection sections of the manual. The 211u001einspector is encouraged to copy the checklists for use during construction. 211u001eAppendix A contains blank forms that can be used for proper documentation and 211u001etesting during soil nail wall construction. Appendix B contains examples of 211u001ecompleted forms.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号