首页> 美国政府科技报告 >Soil Nailing Field Inspectors Manual: Soil Nail Walls. Demonstration Project 103
【24h】

Soil Nailing Field Inspectors Manual: Soil Nail Walls. Demonstration Project 103

机译:土壤钉子检查员手册:土壤钉子墙。示范项目103

获取原文

摘要

The purpose of this manual is to provide field inspectors with the knowledgenecessary to effectively monitor and document the construction of soil nail retaining walls. The manual provides information useful to both the experienced and inexperienced soil nail inspector. The manual is organized into two main parts: Preconstruction Preparation and Construction Inspection. Checklists are provided throughout the Construction Inspection sections of the manual which summarize key items discussed in the text. The inspector is encouraged to copy the checklists for use during construction. Appendix A contains blank forms that can be used for proper documentation and testing during soil nail wall construction. Appendix B contains examples of completed forms. Construction inspectors and engineers from California, Oregon, Texas, and Washington State departments of transportation contributed to this manual. The International Association of Foundation Drilling also provided input from the industry perspective.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号