首页> 美国政府科技报告 >Coal Combustion Waste Impoundment Round 7-Dam Assessment Report. Ottumwa Generating Station, Ash Impoundment Dikes, Interstate Power and Light Company, Ottumwa, Iowa.
【24h】

Coal Combustion Waste Impoundment Round 7-Dam Assessment Report. Ottumwa Generating Station, Ash Impoundment Dikes, Interstate Power and Light Company, Ottumwa, Iowa.

机译:燃煤废物蓄水第7轮大坝评估报告。

获取原文

摘要

The release of over five million cubic yards from the Tennessee Valley Authority's Kingston, Tennessee facility in December 2008 flooded more than 300 acres of land. A first step to prevent such catastrophic failure and damage is to assess the stability and functionality of the ash impoundments and other units, then quickly take any needed corrective measures. This assessment of the stability and functionality of the Ottumwa Generating Station ash management units is based on a review of available documents and on the site assessment conducted by Dewberry personnel on Wednesday, October 6, 2010 and technical information provided subsequent to the site visit. We found the supporting technical documentation adequate In summary, the Ottumwa Generating Station ash impoundment embankments are satisfactory for continued safe and reliable operation, with no visual/recognized existing or potential management unity safety deficiencies.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号