首页> 美国政府科技报告 >Design,Development and Test of a Wayside Power Distribution and Collection System for the Tracked Levitated Research Vehicle.
【24h】

Design,Development and Test of a Wayside Power Distribution and Collection System for the Tracked Levitated Research Vehicle.

机译:履带悬浮式研究车辆路边配电系统的设计,开发和试验。

获取原文

摘要

This document presents test activity description and results of the wayside power distribution and collection system designed for the TLRV, a high-speed ground transportation vehicle. The system was assembled at the U.S. Navy testing grounds,China Lake,California to prove the design concept and feasibility of transferring high-electrical power between rail and collector brushes at elevated speeds while subjected to prevailing environmental conditions. With minor modifications,the initial design conformed to specified requirements up to speeds in excess of 300mph. Analysis of the rail configuration and test results indicated that distance between the wayside rail supports could be doubled (25ft) lessening by half the number of supports required to maintain the rail's alignment integrity at design speeds. Installation of the wayside rail system at HSGTC,Pueblo,Colorado will be constructed using the 25ft span configuration.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号