首页> 美国政府科技报告 >Pollution Control of Blast Furnace Plant Gas Scrubbers Through Recirculation,
【24h】

Pollution Control of Blast Furnace Plant Gas Scrubbers Through Recirculation,

机译:通过再循环对高炉厂气体洗涤器的污染控制,

获取原文

摘要

A system was developed and facilities were installed at Interlake,Inc.,Chicago Blast Furnace Plant,to treat,clarify,cool,and recirculate the blast furnace and sinter plant wet scrubber effluents in one unified system,in order to effectively re-use these waters and eliminate their discharge into the Calumet River. Prior to recirculation of scrubber waters,the concentration of contaminants (specifically suspended solids,hexane solubles,ammonia nitrogen,cyanide and iron) in effluent waters consistently exceeded the Illinois code limitations with gross contaminant discharges totaling about 4,100tons per year. The contaminant intake from the river was about 2,900tons per year,so the net contaminant discharge to the river was 1,200tons per year or about 2pounds per ton of hot metal produced. After the recycle system was placed in operation,the gross contaminant discharge decreased to 1,900tons per year,and the net discharge became a negative quantity. The construction cost of the unified blast-furnace and sinter plant recirculating system was $1,109,400for this 2-furnace plant producing about 3,200tons of hot metal and 3,300tons of sinter per day. Operating costs are about $285,000per year higher than the costs of operating the old 'once-through'water system. Elimination of dredging costs,and increased iron recovery produce savings of about $10,000per year,so the net increase in plant operating costs is about $275,000per year. This amounts to about $.0001per gallon of throughput. Portions of this document are not fully legible.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号