Evaluation of the Performance of a Press-Lam Timber Bridge. Interim Report Number 1, Bridge Installation and Load Test

机译:压榨林桥的性能评价。第1号中期报告,桥梁安装和负载测试

获取原文

摘要

This report describes the installation and load test of the world's first press-lam timber bridge superstructure. A five-man crew replaced the substandard steel stringer-timber deck superstructure on Rte. 610 over Little Stoney Creek in Shenandoah County with the press-lam superstructure in about four work days, and the road was closed for only eight hours. Results of the load tests conducted two weeks after the 17.5 ft. (5.33 m) span, 2-lane bridge was constructed suggest that the stringer live load distribution specified by AASHTO is conservative. The Research Council will inspect and load test the bridge periodically over a five-year period.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号