首页> 美国政府科技报告 >Dissolution of Composition B Detonation Residuals.
【24h】

Dissolution of Composition B Detonation Residuals.

机译:组合物B溶出残留物的溶解。

获取原文

摘要

Composition B (Comp B) detonation residuals pose environmental concern to the U. S. Army because hexahydro-1,3,5- trinitro-1,3,5-triazine (RDX), a constituent, has contaminated groundwater near training ranges. To mimic their dissolution on surface soils, we dripped water at 0.51 mL/h onto individual Comp B particles (0.1-2.0 mg) collected from the detonation of 81-mm mortars. Analyses of the effluent indicate that the RDX and 2,4,6- trinitrotoluene (TNT) in Comp B do not dissolve independently. Rather, the relatively slow dissolution of RDX controls dissolution of the particle as a whole by limiting the exposed area of TNT. Two dissolution models, a published steady-flow model and a drop-impingement model developed here, provide good agreement with the data using RDX parameters for time scaling. They predict dissolution times of 6-600 rainfall days for 0.01-100 mg Comp B particles exposed to 0.55 cm/h rainfall rate. These models should bracket the flow regimes for dissolution of detonation residuals on soils but they require additional data to validate them across the range of particle sizes and rainfall rates of interest.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号