首页> 美国政府科技报告 >Survey Relating to the Implementation of Cost/Schedule Control Systems Criteria within the Department of Defense and Industry
【24h】

Survey Relating to the Implementation of Cost/Schedule Control Systems Criteria within the Department of Defense and Industry

机译:关于在国防和工业部内实施成本/进度控制系统标准的调查

获取原文

摘要

Since 1967, the DOD has required its contractors to have cost and schedule performance measurement systems that satisfy certain criteria. These criteria are considered necessary to monitor and control contract performance. Specifically, the objectives of the criteria are for contractors to have cost and schedule control systems which accomplish both of the following: are effective for contractors in meeting their requirements for controlling contract performance; and Provide data which give an adequate basis for responsible decision-making by both contractor management and DoD components. The criteria, known as the Cost/Schedule Control Systems Criteria (C/SCSC), are applicable to selected contracts within programs designated as major system acquisitions. Over the years since 1967, controversies surrounding C/SCSC and associated reporting requirements have existed within industry and government. These controversies or issues can be categorized under two headings: (1) whether the costs of the criteria and associated reporting requirements outweigh their benefits, and (2) concerns about the specifies of how these requirements have been implemented.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号