How Does the Air Force Create Effective Accountability for Initial Spares?

机译:空军如何为初始备件创建有效的问责制?

获取原文

摘要

The accountability for acquisition cost, schedule, and performance lies with the Program Manager. The Goldwater-Nichols Act reinforces this fact and calls for the streamlining of the system to support the Program Manager. Initial spares requirements are part of the acquisition baseline for which the Program Manager is responsible. However, the processes are not in place to allow the Program Manager to effectively manage this cost element. Initial spares have traditionally been managed in Air Force Command on a commodity basis and, therefore, the data systems and procedures that exist today do not support the information that is needed on a weapon system basis. This paper addresses the different organizations involved in th traditional management of initial spares, the lessons learned in estimating the initial spares requirements baseline, and provides recommendations on how the processes should be changed in the future. If the Program Manager is to be held accountable for the delivery of a fully supported weapon system, then some major changes must be put in place. This paper presents several options as to how the processes should be changed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号