首页> 美国政府科技报告 >Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Evaluationof the Rehabilitation Program for Relief Wells at Leesville Dam, Ohio
【24h】

Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Evaluationof the Rehabilitation Program for Relief Wells at Leesville Dam, Ohio

机译:维修,评估,维护和康复研究计划。评估俄亥俄州利斯维尔大坝救济井的修复方案

获取原文

摘要

At a relief well and drainage system rehabilitation workshop held in April 1985,it was determined that maintenance methods varied between Districts and that no attempt had been made to document results versus the method used. The Huntington District was planning the rehabilitation of 12 wells at Leesville Dam, Ohio, and agreed to use a composite of the various common Corps of Engineer (CE) cleaning methods along with the extra verification procedures needed to document the results. Therefore, the objectives of the study were to document a commonly used

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号